Capacity 100-150m3/h mobile sand stone washing&gold separating plant
Gold Mining Machine technical process
The Raw material into feed hopper by excavator or loader,then into trommel screen by swilling of water classified into 4size 0-6mm; 6-10mm; 10-30mm >30mm;
>30mm waste material transported by conveyor into scrap area;
10-30mm material transported by conveyor into destination area;
6-10mm material transported by conveyor into destination area;
0-6mm material into mineral box and send to 1200# horizontal automatic discharge gold concentrator to get concentrate,the waste material discharged from discharge pipe.
Gold Mining Machine detail parameter
Production Name |
|
|
|
|
|
|
|
Length 13m |
1pcs |
- |
|
|
Used trailer chasis |
|
3500*3600 |
1set |
- |
|
|
|
Trommel screen |
Inner diameter 1.3m,outer diameter 1.6m,screen mesh 4.3m |
1set |
11 |
|
|
|
Centrifugal concentrator |
1200# horizontal gold concentrator |
1set |
21.5 |
|
|
|
Transport conveyor |
Belt width 600mm,pole length 6m |
3pcs |
5.5*3 |
|
|
|
Sand pump&mineral box |
4inch sand pump+11KW motor+mineral box |
1set |
11 |
|
|
|
Centrifugal pump |
|
1set |
5.5 |
|
|
|
Driving&directions system |
2axles 8wheels |
1set |
- |
|
|
Can be customized |
Electric box |
|
1pcs |
- |
|
|
|
Total power |
65.5KW |
Previous content:80-100ton/hour river gold mining machine
产品分类
/PRODUCTS推荐产品
/PRODUCTS推荐文章
/NEWS- Facts About Environmental Equipment
- To Focus on the Wearing Parts of Roller Crusher
- Some Tips to the Application of the Lubrication of Impact Crusher
- The Development of VSI Crusher Solves the Shortage of the Artificial Sand
联系我们
/CONTACTQingzhou Guancheng Heavy Industrial Machinery Co.,Ltd.
+86 536 3593111
地址:Dongjiande Village, Huanglou Street Office, Qingzhou, Shandong, China (Mainland)
电话:+86 536 3593111
传真:+86 536 3593111
手机:+86 15653473333,15053659999
Email:1592999333@qq.com