HOME>CASE >The gold get by horizontal automatic discharge gold concentrator

The gold get by horizontal automatic discharge gold concentrator

gold mining

gold mining

Above picture is the gold get by gold mining machine our horizontal gold concentrator sending by our engineer this morning in the mining area.

The horizontal gold concentrator with automatic discharge is one of our main product newly designed it can work well in the gold dredger,mobile gold separating car,

it can solve the knelson series  can't work on jolt surrounding and no need of foundation seeking ground level,it can automatic discharge with air operating solenoid valve and good performance.

Detail parameter of Gold mining machine 


Production Name


Specification


Capacity


Power


Weight


Horizontal knelson centrifuge gold concentrator

2450*1720*1690

5-7

6.05

2400kgs


Horizontal knelson centrifuge gold concentrator

2450*1720*1690

15-30

6.05

2600kgs


Horizontal knelson centrifuge gold concentrator

2780*1850*1950

30-50

10.5

3200kgs


Horizontal knelson centrifuge gold concentrator

3800*1900*2950

100-120

21.5

7800kgs

Operation process of gold mining machine,mining machinery

1)Open the PLC control box, turn on the main power, then getting into the system and setting parameters, waiting for the air compressor to inflate;

2)Start the centrifugal pump and adjust the water pressure to about 0.3MPa by switch. (the water pressure needs to sum up the experience and adjust itself according to the actual situation);

3)Click on the automatic mode of "Cycle" to start work;

4)Shut down: firstly should turn off the feeding of raw material, when discharge finished click "automatic stop", turn off the main power and finally turn off the centrifugal pump.

The maintainence of gold mining machine,mining machinery

1)Because the knelson centrifuge gold concentrator is rotating at high speed, it will produce vibration, so we should check whether the bolt is loose or not at any time.If loose there will be abnormal sound, please stop in time to check.

2)Weather, temperature, humidity and other factors will have a greater impact on the life of V-belt, please check if need change please replace one whole set.

3)Butter must be added to each shift for 8 hours. Lack of oil can cause damage to bearings.

If problems cann’t be solved please contact Qingzhou Guancheng Heavy Industrial Machinery Co., Ltd. (It’s better to send photos,video to our company via email then we can response very soon)

产品分类

/PRODUCTS

推荐案例

/PRODUCTS

联系我们

/CONTACT

Qingzhou Guancheng Heavy Industrial Machinery Co.,Ltd.

+86 536 3593111

地址:Dongjiande Village, Huanglou Street Office, Qingzhou, Shandong, China (Mainland)

电话:+86 536 3593111

传真:+86 536 3593111

手机:+86 15653473333,15053659999

Email:1592999333@qq.com

Qingzhou Guancheng Heavy Industrial Machinery  Co.,Ltd.鲁ICP备09020970号-29
鲁ICP备09020970号-29